BIM clash detection details banner

BIM Clash Detection

for healthcare, institutional,
office, and high-rise projects

Details | Specifications

Style

BIM models with varying LOD level

Output Format

PDF Files

Software

Revit and Navisworks

Redlines

Two rounds of clashes

Files accepted

RVT Revit models of individual disciplines/divisions

FAQ

How does the process work?

After the BIM models of each discipline are received or built, BluEnt aligns all the models in Revit. Clash detection is then run using Navisworks and initial interference reports are generated and sent back to the client / contractor. The contractor finds solutions to the interferences with its engineers and sends back the up