Canada, Toronto & GTA A different standard, not a lighter one.

Canadian millwork is documented to AWMAC conventions, and the differences from AWI are large enough to matter on a submittal. A set drawn to the wrong standard is not slightly wrong, it is answering a different document.

What this market expects

AWMAC conventions, not AWI applied to a Canadian project.
The Architectural Woodwork Manufacturers Association of Canada publishes its own standards, and the grade definitions, tolerances and construction requirements are not interchangeable with the American ones.
Guarantee and Inspection Service obligations understood.
Where a project specifies GIS, the fabricator carries obligations around inspection and remedy, and those affect what the documentation has to demonstrate.
Both units in circulation.
Canadian projects use imperial and metric, sometimes on the same job, depending on the design team and the product. The package has to be consistent within itself and correct for the project.
Institutional and public procurement rigour.
Education, healthcare and civic work here is tendered and reviewed carefully.
Casework section drawn to AWMAC conventions with the governing standard identified in the general notes
The applicable standard stated on the sheet.

Standards that govern here

AWMAC publishes the standards that govern most Canadian architectural woodwork, with its own grade structure and construction requirements.

Guarantee and Inspection Service. Where a specification calls for it, the programme imposes obligations on the fabricator around inspection and remedy. Those carry cost and process implications, and they belong in the estimate rather than being discovered.

We detail to the standard your project names and report what it requires. We hold no membership of AWMAC and we are not an inspection authority.

Market requirements

Requirement
What it changes in the package
AWMAC grade structure
Substrate, tolerance and construction obligations drawn to the Canadian standard, not the American one
GIS obligations
Inspection and remedy implications identified as cost and process at reading stage
Unit convention
Confirmed per project and applied consistently, imperial or metric, never mixed
Bilingual documentation
Where a project requires it, confirmed at scoping
Public procurement
Bid documentation structured to the tender route the project uses
Submittal convention
Governing standard identified in the general notes so a reviewer does not have to infer it

Talk to your market team

Where packages fail here

AWI applied to an AWMAC project.
The most common failure and the most avoidable, and it is usually invisible until review.
GIS obligations unpriced.
Inspection and remedy requirements read as background on a project that specified them.
Units mixed within one package.
Particularly on projects where the architectural set and the product data disagree.
The governing standard unstated on the drawing.
A reviewer left to infer which document the set intends to satisfy.

Sectors active here

Services that apply

Answers

Common questions

Do you work to AWMAC rather than AWI?
To the standard your project specification names. Canadian projects usually name AWMAC, and the grade structure and construction requirements are read from that document rather than assumed from the American equivalent.
Are you AWMAC members?
No. We detail to the standard the project names and report what it requires. Membership and inspection authority sit with the bodies that hold them.
Do you have people in Canada?
Our market office is in Toronto. That is where your account lead sits and where the named senior reviewer who signs off your work is based. Production is at our studios overseas.
Imperial or metric?
Whichever the project uses, applied consistently. Both are in circulation in this market and mixed-unit documents are a known source of error.

Send a Canadian package with its specification

Which standard governs, and what it obliges, is usually the first useful thing to establish.

  • AWMAC and GIS read from the specification, not assumed from AWI
  • Unit convention confirmed per project, never mixed
  • Named account lead and senior reviewer in your time zone
  • One named contact, not a general queue

Read How We Deliver

Talk to your market team

Scope and questions come back, not a template.

  • This field is for validation purposes and should be left unchanged.
  • Accepted file types: pdf, dwg, Max. file size: 100 MB.

Reserve Your
Meeting Slot Today!

Contact Now

Connect with us!

Let's Talk Fixed form

Let's Talk

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Services We Offer*
Subscribe to Newsletter
Go up