Where a project imposes seismic requirements, casework stops being purely joinery. Anchorage, restraint and the structure behind a cabinet become engineering questions, and the drawing's job is to carry what the engineer determined rather than to determine it.
This is the important part of the page and it is stated plainly.
A drawing that appears to answer a structural question is worse than one that raises it, because it looks authoritative.
What detailing does is carry the determination into the documentation accurately, and raise the conditions that need an engineer's answer before they become site problems.
Answers
A structural question raised early costs a query
Scope and questions come back, not a template.
Connect with us!
Let's Talk
"*" indicates required fields