Every service line, with its current state. Three states are used and the difference between them is the point of the register: delivered today, quoted on enquiry, or recorded as direction and not offered.
Sub-service lines within each are set out on the service pages themselves.
Adjacent areas that appear on the capability map and are not offered. They are set out in full on horizon practices, and the direction attached to them is on the Track B roadmap.
Two boundaries are permanent rather than developmental, and worth stating here: structural steel, curtain wall and architectural aluminium detailing are not offered, and machine post-processors and G-code are partner-delivered and are not offered. Neither is on a roadmap.
A capability moves from direction to enquiry, and from enquiry to delivered, when the conditions attached to it are met rather than when demand appears. Those conditions are recorded on the roadmap.
The register reflects the current state. It is not a forecast, and a line's presence in a lower tier is not an indication that it will move.
Service Register
Connect with us!
Let's Talk
"*" indicates required fields