Joinery and millwork bills of quantities One list, priced by everyone the same way.

A bill of quantities lets several parties price the same scope on the same basis. When every bidder prices the same itemised list, the differences between the bids are commercial rather than interpretive. That is the whole value, and it is lost the moment the document stops being consistent.

Part of Quantity take-offs and estimating One of four capabilities within the line

What is prepared

Itemised measured works
Structured by element or by section as the project requires.
Descriptions
Written to the measurement convention in use on the project, not to a house format.
Quantities with units
Measured consistently and to a stated basis.
Preliminaries and provisional items
Identified rather than absorbed into rates.
Inclusions, exclusions and assumptions
Separated and stated.
A priceable structure
One a quantity surveyor or estimator can work from directly, without rebuilding it first.
Close-up of a curved wooden joint between two interlocking pieces
Every joint and every piece is counted, not estimated.

Why comparability is the point

A materials list tells you what to buy. A bill of quantities tells several bidders how to price the same thing.

That difference changes how the document is written. Descriptions have to be unambiguous to someone who did not measure it. Items have to sit where the convention expects them, not where they happen to appear in the drawings. Provisional items have to be visible rather than buried, because a provisional sum absorbed into a rate destroys the comparison it exists to enable.

Terminology, handled honestly

British and North American practice use different words for related things, and mixing them causes real confusion in pricing.

In UK and European practice this is joinery work, and the document is a bill of quantities prepared to an established measurement convention. In North American practice the equivalent function is more often served by a bill of materials or a Div 06 40 00 bid package, structured around the specification section rather than around measured works.

Preparation follows the convention your project actually uses. One is never relabelled as the other, and a US-format schedule is never presented as a BOQ.

Where a BOQ is expected

Formally procured work in the United Kingdom and much of Europe, where the tender route assumes one. It also appears on larger North American packages where a common pricing basis across subcontractors matters more than speed.

Where a project does not require a BOQ, we will say so rather than preparing one because it was asked for by name.

Who this suits

Joinery firms bidding formally procured work. Contractors who need a common pricing basis across subcontractors. Consultants preparing a package for tender who need the measurement done properly rather than quickly.

Send a bid package - free first take-off

When every bidder prices the same itemised list, the differences between bids are commercial.

Answers

Common questions

Do you prepare to a specific measurement convention?
Preparation follows the convention the project requires. The applicable convention is confirmed at scoping rather than assumed, because getting it wrong makes the document unusable for its purpose.
How is this different from a material take-off?
A take-off measures what must be bought. A bill of quantities is a formal pricing document structured for comparability between bidders. They are produced from the same geometry and answer different questions.
Can you prepare a BOQ for a North American project?
Yes, though the more usual North American formats are a bill of materials or a specification-section bid package. We will tell you which one the project actually needs.
Do you use metric?
Yes on UK and European work, throughout, including the schedules. Imperial is used on North American work. Mixed-unit documents are a known source of pricing error and we do not produce them.

Send a bid package - free first take-off

Send the tender documents for an upcoming joinery package.

What comes back is a priceable document, not a materials list.

  • Prepared to the convention your project actually uses, never relabelled
  • Inclusions, exclusions and assumptions separated clearly
  • A structure a quantity surveyor or estimator can work from directly
  • One named contact, not a general queue

Free first take-off

Scope and questions come back, not a template.

  • This field is for validation purposes and should be left unchanged.
  • Accepted file types: pdf, dwg, Max. file size: 100 MB.

Reserve Your
Meeting Slot Today!

Contact Now

Connect with us!

Let's Talk Fixed form

Let's Talk

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Services We Offer*
Subscribe to Newsletter
Go up