The specification decides what you are contracted to deliver, and it is the document most likely to be skimmed. It is where the grade sits, where the governing standard is named, where testing and certification obligations appear, and where the clause that adds materially to your cost is hiding in a paragraph nobody read twice.
Grade is the single clause most often read as a label rather than as a cost driver. It is not.
A grade sets the acceptable substrate. It sets edge banding thickness and joint quality. It sets the permitted gap between a door and its frame, between adjacent doors, and between a drawer front and its opening. It sets what counts as an exposed, semi-exposed or concealed surface, and those three categories carry different material and finish obligations on the same item.
Specifying a substrate that the grade does not permit for an exposed application is a rejection, not a comment. So is a hardware callout that names a function without a manufacturer, model, load rating and finish where the grade requires that level of specificity. None of this appears on the architect's drawings. All of it is priced.
A findings report listing each item, where it sits in the documents, what it implies commercially or technically, and a recommendation.
Items requiring a design-team answer are drafted as RFIs, ready for you to issue. Items affecting buildability go to constructability review. Items affecting quantities go back to the estimator with the clause reference attached.
Findings and recommendations are reported. BluEnt does not issue compliance certification and is not the certifying authority under any quality programme. Where a condition raises a structural question, it is flagged for a qualified engineer rather than answered.
Selected work
The clause that adds materially to cost is hiding in a paragraph nobody read.