Tilke & Partners W.L.L.
Case study

BIM Consultant for the LOD 300 Model generation.

About Tilke & Partners W.L.L.

Tilke aims to design individual and state-of-the-art race tracks including grandstands, pit buildings, team buildings and other infrastructure facilities by fulfilling their clients’ needs and the permanently changing requirements on track-layout and safety. Tilke is also involved in the design of hotels, administration buildings, housing projects, malls, and any sports and leisure facilities. 

Tilke & Partners W.L.L.
Project requirements

Project Brief

NDA was signed and project drawings/ inputs were received from client.

Scope of work :

  • Draft the complete Revit model of the Medical Rehabilitation center which includes Architectural, Structural, Mechanical, Plumbing, Electrical and fire protection in Revit based on AutoCad/Pdf’s provided by Client.

  • All models to be developed to LOD 300, reflecting the same level of detail as the dwgs provided by client.

  • Full clash detection report to be included.

We submitted the BID as per the RFP.

Blue bird

Maximum Value. Achieved.

Successfully completed more than 4 projects for this client. The names of the project are 

  • Pi-cake

  • Gil Project

  • House no 4481

  • Weke project

Our Other Case Studies

Connect with us!

Let's Talk Fixed form

Let's Talk
  • This field is for validation purposes and should be left unchanged.